5 Agile Frameworks – Scrum, XP, SAFe, Kanban, Lean

5 Agile Frameworks – Scrum, XP, SAFe, Kanban, Lean

Marvel Cinematic Universe (MCU) Movies in Timeline Order for Watching

Marvel Cinematic Universe (MCU) Movies in Timeline Order for Watching | Image Courtesy of Marvel Entertainment
  1. Captain America: The First Avenger (1942)
  2. Captain Marvel (1995) – but don’t watch the post-credits scene until you’ve watched Infinity War… #spoilers
  3. Iron Man (2008)
  4. Iron Man 2 (2011)
  5. The Incredible Hulk (2011)
  6. Thor (2011) – six months before Avengers
  7. The Avengers (2012)
  8. Iron Man 3 (2012) – six months after The Avengers
  9. Thor: The Dark World (2013) – after Avengers but before Ultron
  10. Captain America: The Winter Soldier (2014) – after Avengers but before Ultron
  11. Guardians of the Galaxy (2014)
  12. Guardians of the Galaxy 2 (2014)
  13. Avengers: Age of Ultron (2015)
  14. Ant-Man (2015)
  15. Captain America: Civil War (2016) – after Ultron and before Infinity War
  16. Black Widow (2016, excluding post-credits scene) – right after Civil War
  17. Spider-Man: Homecoming (2016) – after Civil War and before Infinity War
  18. Doctor Strange (2016-2017)
  19. Black Panther (2017)
  20. Thor: Ragnarok (2017) – after Ultron and before Infinity War
  21. Avengers: Infinity War (2017)
  22. Ant-Man and the Wasp (2017) – takes place at the same time as Infinity War since the post-credit scene takes place during the snap
  23. Avengers: Endgame (2017-2022)
  24. Shang-Chi and the Legend of the Ten Rings (2023)
  25. Spider-Man: Far From Home (2023)
  26. Eternals (2023, excluding flashbacks)
  27. Spider-Man: No Way Home (2024)
  28. Dr. Strange in the Multiverse of Madness (2025)
  29. Thor: Love and Thunder (2025)
  30. Black Panther: Wakanda Forever (2025)
  31. Ant-Man: Quantumania (2026)
  32. Guardians of the Galaxy: Vol 3 (2026)
  33. The Marvels (2026)
  34. Deadpool & Wolverine (Outside of time, watch whenever you like)
  35. Captain America: Brave New World (2027)
  36. Thunderbolts (2027)
  37. Fantastic Four (2028… but also the 1960s, maybe)
  38. Avenger’s Doomsday (2028)

Product Management vs Project Management

Product Management vs Project Management

Key Terms in Project Management

Key Terms in Project Management

6 Agile Scrum Principles Summarised

6 Agile Scrum Principles Summarised

Agile Scrum Overview

Agile Scrum Overview

Project Management Processes

Project Management Processes

Agile Project Manager and Scrum Master

Agile Project Manager and Scrum Master

What is Agile Scrum?

What is Agile Scrum?

Prioritising Sprint Backlog with MOSCOW technique in Agile Scrum

Project Management Processes

Project Management Processes

Scrum Master Approaches

Scrum Master Approaches

Types of Project Management

Types of Project Management

Agile – Scrum vs Kanban

Agile – Scrum vs Kanban

Requirements Quality Checklist

Requirements Quality Checklist

Leaders in Transformation

Leaders in Transformation

Project Planning Processes

Project Planning Processes

Kanban Summary

Kanban Summary

At Trafford Centre, 14/10

At Trafford Centre, 14/10

Project Planning Summary

Project Planning Summary

Bolton Market Place Shopping Centre today, 13/10

Bolton Market Place Shopping Centre

Bolton Market Hall is a listed building in Bolton, Greater Manchester that is now the Market Place Shopping Centre. The market hall and its integral ground-floor shops on Bridge Street, Corporation Street and Knowsley Street are included in the English Heritage listing.

Bolton Market Hall was designed by architect G. T. Robinson, and opened on 19 December 1855. Measuring 294 feet (90 m) in length and covering an area of 7,000 square yards (5,900 m2) it was said to be ‘the largest covered market in the kingdom’. It cost £50,000.

A long procession led to the opening ceremony. To complement the produce stalls and boost custom, a fish market was built next to it which opened in 1865 at a cost of £30,000. The fish market was demolished in September 1932.

The market hall was modified in 1894 and further alterations were carried out at the turn of the 20th century. In 1938 the interior layout changed with roofed stalls in tightly packed islands replacing the long rows of stalls and in 1982 a competition brief to redevelop the site immediately to the north of the market hall into a shopping centre was won by Chapman Taylor Partners. In 1985 Grosvenor Developments took over the Market Place project from Wimpey Property Holdings.

The hall was refurbished in the 1980s to become the Market Place Shopping Centre and was opened in 1988 by Queen Elizabeth II.

Benefits Realization Process

Benefits Realisation Process

Birthday today… 13/10

Birthday today…

Project Management Processes and Reports

Project Management Processes and Reports

At Dunscar Golf Club, Bolton – 12/10

At Dunscar Golf Club, Bolton – 12/10